Systems integration

One coordinated production line

A Cyprus-based integration team may use robots and equipment from international manufacturers. Confirm who designs, builds, installs and supports each part, including CE conformity responsibilities.

  1. 01

    Engineering and layout

    Translate the process into a layout, cycle-time model and specification. Confirm utilities and upstream and downstream interfaces.

  2. 02

    Tooling, controls and safety

    Include fixtures, end effectors, conveyors, PLCs and safeguards in one scope. Check destination requirements before construction.

  3. 03

    Factory acceptance testing

    Agree measurable criteria before ordering and test representative parts under production conditions.

  4. 04

    Installation and site acceptance

    Plan freight, access, rigging, utilities and commissioning. Identify the local team and final acceptance conditions.

  5. 05

    Training and ongoing support

    Include training, documentation, spare parts and escalation procedures. Establish software ownership and access rights.

Make proposals comparable

  • Use the same specification for each supplier
  • Separate equipment, freight and installation costs
  • Document exclusions and buyer responsibilities
  • Agree milestones and acceptance evidence

Define your complete line